Kokez
- 1Inventory readiness
The readiness list shows which required inventory, site, and species-mapping records are present.
- 2Stand preparation
Structure summaries and missing tree values are reported from the project’s current records.
- 3Simulation queue
Queued, running, successful, and failed work comes directly from the FVS simulation control data.
- 4Analysis readiness
Compiled pathways and calculated management objectives become available only after their corresponding checks pass.
This overview reports the project’s current database checks and simulation state. It does not assume that inventory preparation, simulation, or objective calculation has finished.
Decision-support workflow
- Database
- In the browser
- FVS / R worker
- 1InventoryComplete
- 2Species mapComplete
- 3Missing tree valuesComplete
- 4Stand structureComplete
- 5Scoping & groupingComplete
- 6Treatments & regenerationIncomplete — later steps done
- 7FVS simulationComplete
- 8PathwaysComplete
- 9Management objectivesComplete
- 10TOGGLE alternativesComplete
- Complete
- Next step
- Incomplete — later steps done
- Waiting
Project readiness
5 steps outstandingThese steps must be complete before pathways can be simulated. Each row is one check in the database.
- Compartments loaded
- Tree data loaded
- Species map assigned
- Every species mapped to an FVS species
- Site-index species mapped to an FVS species
- Every stand has site index, variant and hemisphere
- Calibrations assignedRecommended, not required
- Every species has a calibrationRecommended, not required10 to SN HM, 2 to SN SA, 21 to SN AB, 23 to SN AH, 24 to SN SB, 25 to SN CW, 29 to SN BE, 3 to SN SP, 4 to SN FR, 45 to SN SK, 48 to SN PO, 75 to SN DW … and 1 more
- No missing tree values
- Stand structure summary calculated
- Scoping groups created
- Every group has treatments2, 4, 5, 6, 7
- Species named in treatments mapped to FVS species
- Regenerating treatments have a regeneration defined
- Every group has regeneration3, 4, 5, 6, 7, 8
- Regeneration species mapped to FVS species
- Time attributes set
- Pathways simulated
- Pathways compiled
- Simulated stand structure summarised
- Management objectives assigned
- Management objectives calculated
- Management objectives up to date
Simulation
Scoping groups are handed to the FVS engine one at a time. Progress is read from the database.
10 scoping groups queued for FVS
Demo: replays the Kökez run made with the FEMS worker (rFVS, SN variant) — the values are the real FVS output.