Skip to content
FEMS

DemoDemo — everything is read-only. The sliders, charts and map all work; only saving is refused. Sign in for an account with write access.

Kokez

  1. 1Inventory readiness

    The readiness list shows which required inventory, site, and species-mapping records are present.

  2. 2Stand preparation

    Structure summaries and missing tree values are reported from the project’s current records.

  3. 3Simulation queue

    Queued, running, successful, and failed work comes directly from the FVS simulation control data.

  4. 4Analysis readiness

    Compiled pathways and calculated management objectives become available only after their corresponding checks pass.

This overview reports the project’s current database checks and simulation state. It does not assume that inventory preparation, simulation, or objective calculation has finished.

Use the first outstanding readiness item as the next project task.

Decision-support workflow

  • Database
  • In the browser
  • FVS / R worker
  1. 1
    InventoryComplete
  2. 2
    Species mapComplete
  3. 3
    Missing tree valuesComplete
  4. 4
    Stand structureComplete
  5. 5
    Scoping & groupingComplete
  6. 6
    Treatments & regenerationIncomplete — later steps done
  7. 7
    FVS simulationComplete
  8. 8
    PathwaysComplete
  9. 9
    Management objectivesComplete
  10. 10
    TOGGLE alternativesComplete
  • Complete
  • Next step
  • Incomplete — later steps done
  • Waiting

Project readiness

5 steps outstanding

These steps must be complete before pathways can be simulated. Each row is one check in the database.

  1. Compartments loaded
  2. Tree data loaded
  3. Species map assigned
  4. Every species mapped to an FVS species
  5. Site-index species mapped to an FVS species
  6. Every stand has site index, variant and hemisphere
  7. Calibrations assignedRecommended, not required
  8. Every species has a calibrationRecommended, not required10 to SN HM, 2 to SN SA, 21 to SN AB, 23 to SN AH, 24 to SN SB, 25 to SN CW, 29 to SN BE, 3 to SN SP, 4 to SN FR, 45 to SN SK, 48 to SN PO, 75 to SN DW … and 1 more
  9. No missing tree values
  10. Stand structure summary calculated
  11. Scoping groups created
  12. Every group has treatments2, 4, 5, 6, 7
  13. Species named in treatments mapped to FVS species
  14. Regenerating treatments have a regeneration defined
  15. Every group has regeneration3, 4, 5, 6, 7, 8
  16. Regeneration species mapped to FVS species
  17. Time attributes set
  18. Pathways simulated
  19. Pathways compiled
  20. Simulated stand structure summarised
  21. Management objectives assigned
  22. Management objectives calculated
  23. Management objectives up to date

Simulation

Scoping groups are handed to the FVS engine one at a time. Progress is read from the database.

10 scoping groups queued for FVS

Demo: replays the Kökez run made with the FEMS worker (rFVS, SN variant) — the values are the real FVS output.